REM Frequently Asked Questions

Find the answers to your questions about the REM project and mitigation measures in effect during construction: fare measures and transit options.

REM mitigation measures

What are the mitigation measures?

The closures of the Mount Royal Tunnel on May 11, 2020, and the exo6 Deux-Montagnes line on December 31, 2020, have a considerable impact on users of the Mascouche and Deux-Montagnes lines.

For each phase of construction in each sector of these two lines, mitigation measures have been implemented to allow you to continue to use public transit. These measures include:

  • Transit alternatives.

  • Fare measures.

Were elected officials and municipalities consulted about implementing these measures?

The elected officials, municipalities and districts affected by the closures have been involved in planning the mitigation measures from the outset. Most notably, they have played an active role in task forces led by the Autorité régionale de transport métropolitain (ARTM) and the Ministère des Transports (MTQ).

What fare measures are in effect?

The fares available to users of the Mascouche and Deux-Montagnes lines during REM construction take the impact of this work into account:

  • Users of the exo5 Mascouche line benefit from a discount of up to 30% off, to a minimum monthly fare price of $88.50.

Learn more about the exo5 Mascouche fare measure

Users of the Deux-Montagnes line who are eligible for the fare measure and subscribe to OPUS+ or OPUS+ entreprise may take advantage of a preferential monthly fare of $88.50 (for the regular fare) or $53.00 (for student and reduced-rate fares) until construction is completed.

Learn more about the exo6 Deux-Montagnes fare measure

Will the COVID-19 pandemic affect the mitigation measures?

The ongoing situation related to the COVID-19 pandemic has resulted in a significant reduction in passengers using the public transit network in the Greater Montréal Area. This drop in ridership has led us to make several changes to our service:

  • On the exo5 Mascouche line: Shuttles 501 and 502 have been suspended since August 24, 2020.

  • On the exo6 Deux-Montagnes line: Shuttle 405 is suspended.

How are transit authorities synchronizing their services?

Since the closure of the Mount Royal Tunnel and the implementation of the mitigation measures, a committee (also called a tactical coordination squad) consisting of representatives from the MTQ, ARTM, STM, STL and exo, has been monitoring the morning and afternoon peak periods on a daily basis.

This committee ensures that operations are synchronized and makes daily adjustments to ensure that service runs as smoothly as possible during peak periods.

REM fares

What are the differences between REM fares?

Two REM fares exist for exo6 Deux-Montagnes train users who are eligible for this measure. The available fare is determined based on your area of residence:

  • The MTLREM fare is available for eligible users who do not reside in the Zone 3 catchment area. It allows users to access bus and métro service on the Island of Montréal only, as well as shuttles created for the mitigation measure.

  • The TRAMREM fare is available for eligible users who reside in the Zone 3 catchment area. It allows users to access the entire metropolitan public transit network, which includes trains, buses, the métro and shuttles.

See the terms and conditions

The MTLREM pass does not allow you to take the métro from Montmorency, De la Concorde, Cartier or Longueuil stations, nor to use bus services off of the Island of Montréal, with the exception of REM shuttles.

How do I take advantage of a TRAMREM fare?

As of November 2020:

  • Users in Zone 3 who are eligible for the fare measure and who already hold an MTLREM fare will automatically be eligible for a TRAMREM fare. They do not need to take any action to obtain a TRAMREM fare. A new OPUS card was mailed out around October 20, 2020, for the November pass.

  • Users in Zone 3 who are eligible for the fare measure and who do not currently hold a fare may take advantage of a TRAMREM fare by subscribing to OPUS+ or OPUS+ entreprise. A new OPUS card will be mailed around the 20th day of the month prior to it taking effect.

Users who do not reside in Zone 3 but already hold a TRAMREM pass as part of the fare measure may continue to use this fare.

exo5 Mascouche line transit options

Can I learn more about the route that bypasses the mountain?

The route that bypasses the mountain connects Mascouche station with downtown Montréal during the construction work.

  • There are two morning departures to downtown Montréal: at 6:17 a.m. and 7:30 a.m.

  • In the afternoon, two trains depart Central Station for Mascouche: at 4:13 p.m. and 5:30 p.m.

In order to bypass Mount Royal, trains on the exo5 Mascouche line use a route that is normally reserved for freight trains. As a result, travel time may vary according to rail traffic.

Change of platform at Central Station

Since May 11, 2020, deboarding and boarding at Central Station has taken place on Platform 20.

What are the itineraries and fares for Shuttles 500, 501 and 502?

Shuttles 500, 501 and 502 were created to transport exo5 Mascouche train users to Radisson métro station, on the Green line.

Shuttle Itinerary Accepted fares

Itinerary

500

Accepted fares

Mascouche train station to Radisson métro station Monthly TRAM pass in Zone 6 or higher. Fares for the Terrebonne-Mascouche sector.

Itinerary

501

Accepted fares

Terrebonne train station to Radisson métro station Monthly TRAM pass in Zone 5 or higher. Fares for the Terrebonne-Mascouche sector.

Itinerary

502

Accepted fares

Repentigny train station to Radisson métro station Monthly TRAM pass in Zone 5 or higher. Local fares outside the L'Assomption sector.

See the Shuttle 500 Schedules

Due to low ridership, Shuttles 501 and 502 have been suspended since August 24, 2020.

  • Shuttle 501 users are invited to take line 140 from Terrebonne train station to Radisson métro station.

  • Shuttle 502 users are invited to take line 100 From Repentigny train station to Radisson métro station.

Are the transit options created for the measure universally accessible?

People with reduced mobility have several options to get downtown during the construction work:

  • Two trains to downtown Montréal are universally accessible.

See the exo5 Mascouche train schedules

For other trains that run between Mascouche and Ahuntsic stations only:

  • Toward Montréal, users may exit at Sauvé station and take the 31 Saint-Denis – South bus to the next accessible métro station: Rosemont.

  • Toward Mascouche, users may exit at Henri-Bourassa métro station and go to the bus loop to take the 31 Saint-Denis – South bus to Sauvé métro station.


exo6 Deux-Montagnes line transit options

Why is the exo6 Deux-Montagnes line closing ahead of schedule?

The second phase of the mitigation measures was advanced mainly to facilitate passenger travel.

Beginning this new phase has notably enabled the faster implementation of bus lanes on highway shoulders.

These new measures will allow you to reach your final destination quicker and more easily, with as few connections as possible.

The exo6 Deux-Montagnes line closed on December 31, 2020. Can I still get downtown by public transit?

Absolutely. This closure will require you to change your transit habits, but several options are available to you:

  • Shuttle 404 connects Deux-Montagnes and Grand-Moulin stations with downtown Montréal.

  • Shuttle 498 connects the Sainte-Eustache bus terminal and Sainte-Dorothée train station with downtown Montréal.

  • Shuttle 499 connects Deux-Montagnes train station with Côte-Vertu métro station.

Since january 4, 2021:

  • Shuttle 496 connects Deux-Montagnes and Grand-Moulin train stations with Roxboro-Pierrefonds and Sunnybrooke train stations.

Shuttle 404: Deboarding and boarding downtown will take place at two different locations during the week and weekend.

  • Weekdays: at terminus Mansfield.

  • Weekends: at terminus Centre-ville.

Why isn’t Shuttle 405 running at the moment?

Shuttle 405 is currently suspended due to low passenger traffic.

It usually links Deux-Montagnes station with Sainte-Thérèse station, and allows users to take the exo2 Saint-Jérôme train to downtown Montréal.

The MTLREM pass is not valid on exo2 Saint-Jérôme trains. To use this line, you must hold a TRAMREM, TRAIN or TRAM pass, in Zone 5 or higher, at regular price.

What are the fares for Shuttles 404, 405, 498 and 499?

Shuttles 404, 498 and 499 are only available for users who hold the following fares:

Users who hold a monthly STM pass may visit a metropolitan ticket office to obtain a free pass that allows them to use Shuttles 404, 498 and 499. Please note that payment aboard is not authorized.

Shuttle 405 is free for all users.

Due to low ridership, Shuttle 405 is currently suspended.

Why wasn't an extension of the métro's Orange line to Bois-Franc station planned as a mitigation measure?

The very essence of a mitigation measure is that it can be deployed rapidly. As such, extending the métro cannot be considered as a mitigation measure as it notably requires government studies and approval, which are part of a long-term project led by the ARTM.

Are the transit options for the exo6 Deux-Montagnes line universally accessible?

The current Deux-Montagnes line is not fully accessible to people with reduced mobility. However, users may get downtown by using:

  • The STL's 902 line to Côte-Vertu métro station, which is universally accessible.

  • The STM’s 468 and 968 buses, which are equipped with a front ramp and provide service between Roxboro-Pierrefonds / Sunnybrooke train stations and Côte-Vertu métro station.

  • Côte-Vertu station, which users can pass through to make their way downtown.

Most stops on the 902 (STL), 468 and 968 (STM) lines are universally accessible. Please consult the online schedules to check the list.

Côte-Vertu station is supposed to close in 2021. Where will the shuttles go?

Due to the ongoing COVID-19 crisis, the closure of Côte-Vertu métro station has been postponed to 2021.

While the station is closed, bus and shuttle lines will detour to another métro station on the western section of the Orange line.

These new routes will be planned in partnership with the STM, which has been directly involved with planning the mitigation measures since the start of the REM project.

REM project

Who is leading the REM project?

Several partners are involved with building the REM. Among the main players:

  • The Caisse de dépôt et placement du Québec is leading the project.

  • CDPQ Infra, a Caisse subsidiary, is responsible for planning, financing, completing and operating the REM.

  • A dedicated REM project office is in charge of managing project completion for the entire construction period.

See all of the main partners

What is exo's involvement in the REM project?

The ARTM creates mitigation measures based on the work plans developed by the dedicated REM project office.

It is exo’s responsibility to apply these measures for its users.

How are citizens informed about and involved in the project?

A community relations office has been set up in the REM project office to establish a dialogue with citizens. Its main goals are to:

  • Inform the public about the various stages of construction.

  • Answer questions about issues raised.

  • Follow up regularly with municipalities and citizens.

Construction of the REM is disrupting the public transit network. What is the nature of this work?

CDPQ Infra is in the process of completely transforming the Deux-Montagnes line with new technology: a fully automated, 100% electric light metro rapid transit network.

This work is particularly significant, and consists of:

  • Changing the rail foundations and power supply.

  • Building stations.

  • Replacing all level crossings with overpasses.

What construction work can we expect between now and 2023?

The work sequence planned by CDPQ Infra to build the Deux-Montagnes branch of the REM includes two main phases:

  1. Since May 2020: the closure of a first section of the Deux-Montagnes line between Central and Du Ruisseau stations (Mount Royal Tunnel closure).

  2. As of December 31, 2020: the closure of a second section, from Du Ruisseau to Deux-Montagnes stations.

How can I find out more about REM construction work?

To see where construction is taking place and learn more about the types of work and their impacts, we invite you to visit the Works Info section of the REM website.

When will the REM open?

The REM will be commissioned in several phases:

Year Phase
2021 South Shore branch (South Shore to Central Station)
2022 Central section (Central Station to Du Ruisseau)
2023 Sainte-Anne-de-Bellevue branch Airport branch Deux-Montagnes branch (end of 2023)

Need to plan your commute?

Check out the options available to you.

See your transit options

Need more information?

Do you have questions about fares or the mitigation measures?

Write us